↑Back to top
Italy · electric buses Reported by Adnkronos, Nov 12, 2026

YES-EU: signed a preliminary agreement to acquire the former Maserati plant in Turin, planning to build electric buses from 2028

Swiss-headquartered YES-EU bid in Italy with buses built in China by CRRC Electric Vehicle and badged YES-EU. On Nov 12, it signed a preliminary agreement to acquire the former Maserati plant in Grugliasco, Turin, planning to convert it in 2027 and start production in 2028. Ownership has not yet transferred; the purchase price, investment, capacity and models have not been disclosed.

Adnkronos · 2026-11-12 Sustainable Bus · 2026-11-13 Autobusweb · 2026-11 YES-EU website European Parliamentary Research Service · 2026-09
First production lines planned to start
Year 0
Plant conversion in 2027
Site area
0 m²
Corso Allamano 46, Grugliasco, Turin
Maximum headcount at full production
0 people
Peak of about 1400 staff in the Maserati era
Vehicle numbers in the top three lots of the Consip framework
0 units
Framework total of 600 units; ranking does not equal orders
01 / preliminary agreement

Preliminary contract signed in Nov 12; conversion in 2027, production start in 2028

Italian news agency Adnkronos reported on the day of signing that YES-EU had signed a preliminary contract (contratto preliminare) to acquire the former Maserati plant. The plant belongs to Stellantis and was put up for sale after Maserati production moved to Mirafiori in 2022. Consultancy Italiano & Partners is assisting YES-EU with the acquisition, the industrial plan and communications with banks and government authorities.

YES-EU's Turin plant plan: site of about 230,000 square metres, first production lines starting in 2028, up to 150 staff at full capacity
Reported by Adnkronos Nov 12, 2026 · preliminary contract; ownership not yet transferred
Signing date
11/12
2026, preliminary contract
Site area
Approx. 230,000 square metres
Corso Allamano 46, outskirts of Turin
Plant conversion
2027 years
Conversion of existing facilities
First production lines start operation
2028 years
Year-by-year staffing plan not disclosed
Workforce at full production
Up to 150 people
Refers to scale at full production
Planned operations
5 categories
Electric buses and minibuses, battery packs, energy storage systems, aftersales, recycling
Sources: Adnkronos 2026-11-12; Sustainable Bus 2026-11-13
Grugliasco plant headcount: peak of about 1400 under Maserati; YES-EU plans up to 150 at full production
Employees · peak was when Ghibli and Quattroporte were in production
Source: Affaritaliani 2026-11-14; Adnkronos 2026-11-12; shares calculated by the author
Planned headcount is about one-tenth of the peak. Restarting the plant is not the same as employment returning to Maserati-era levels.
As of Nov 14, 2026, 6 elements of the agreement have not been disclosed
Compiled from reports by Sustainable Bus and Affaritaliani
Purchase price not disclosed
Formal contract signing date not disclosed
Investment: conversion spending not disclosed
Annual capacity not disclosed
Models: which buses will be built not disclosed
Manufacturing depthNot stated whether full vehicle production or assembly of imported parts
Sources: Sustainable Bus 2026-11-13; Affaritaliani 2026-11-14
The battery business covers battery packs, energy storage systems, aftersales and recycling; cell production is not mentioned.
Grugliasco plant: from completion in 1959 to planned start of production in 2028
2027 and 2028 figures are YES-EU's announced plans
1959
Bertone builds the plant
It later did contract manufacturing for several automakers, building models such as the Fiat Punto Cabrio and Opel Astra Cabrio.
2009
Acquired by Fiat Group
Converted into a Maserati plant building the Ghibli and Quattroporte, with about 1400 employees at its peak.
2022
Maserati production moves to Mirafiori
Stellantis has begun selling the plant after talks with DR and Etioca came to nothing.
Nov 12, 2026
YES-EU signs preliminary contract
Ownership has not yet transferred; the formal contract is still to be signed.
2027
Plant conversion planned
Conversion of existing facilities.
2028
First production lines planned to start
Up to 150 employees at full production.
02 / YES-EU and CRRC

YES-EU's own-brand buses are produced in China by CRRC Electric Vehicle

YES-EU was founded by Icelander Benedikt Gudmundsson, with its group company established in Engelberg, Switzerland, in 2022. It previously distributed Yutong buses in the Nordics; Norwegian trade outlet Yrkesbil reported on Jan 2026 that Yutong has taken back sales in Norway and that YES-EU is preparing to launch its own-brand buses. Public sources show no equity link between YES-EU and CRRC. YES-EU's website says the company already has a plant of about 7000 square metres in the province of Livorno, Italy, assembling buses and energy storage systems.

Division of roles for YES-EU own-brand buses: CRRC Electric Vehicle manufactures; YES-EU handles sales, specification and after-sales
Compiled from Autobusweb reporting (Nov 2026) and the YES-EU website
Production
CRRC Electric Vehicle
CRRC Electric Vehicle
Vehicles built in China.
→
Brand and sales
YES-EU
The vehicles carry the YES-EU brand, which handles sales, operator-specified configuration and after-sales. Its website says it delivered more than 700 electric buses in 2025.
→
Bidder
YES-EU Italy
Bid with CRRC models in the Consip framework agreement and in tenders from Milan's ATM and Bari.
Source: Autobusweb 2026-11; YES-EU website About page (company statement)
Batteries are CATL LFP packs. The YES-EU website says it has been CATL's official service partner in the Nordics since 2019, expanded to all of Europe in 2023.
YES-EU's two Italian sites: Livorno plant about 7,000 sq m, Turin site about 230,000 sq m
Square metres · Livorno is the plant in use according to the company website; Turin is the site to be acquired under the preliminary contract
Sources: YES-EU website news page (company statement); Adnkronos 2026-11-12; multiples calculated by the author
The Turin site is about 33 times the size of the Livorno plant. The YES-EU website describes the Livorno plant as keeping key production within the EU and reducing dependence on supply chains outside the EU; the plant's output has not been disclosed.
YES-EU's website lists 7 electric bus models, 6.99 m to 25.9 m long
m · Model code and length
Source: Autobusweb 2026-11, citing YES-EU website model pages
YES-EU has not disclosed which of these models the Turin plant will build, or whether it will build new models.
YES-EU website company history: 2008 to 2026
All company-reported
2008
Signs cooperation agreement with Chinese partner
Shifted to electric buses from 2012.
2019
CATL's official service partner in the Nordics
In 2023, the contract was extended Europe-wide.
2020
102 electric buses delivered to Bergen, Norway
Its website calls this a milestone.
2021
Rail transit contract signed with CRRC Electric Vehicle
The original wording on the official website is "Rail transit contract with CRRC".
2022
Entered Germany and Italy
Group company set up in Engelberg, Switzerland.
2025
Delivered more than 700 electric buses
The website states about 300 employees in Europe.
03 / Italian tender

Top three in three Consip framework lots; third in Milan's 110-unit tender

Consip, Italy's central purchasing platform, published its electric bus framework agreement on Jun 30, 2025, covering 600 buses worth over EUR 650 million in 9 lots. Trade outlet Autobusweb disclosed the rankings for 7 of the lots based on the framework agreement documents it obtained. Higher-ranked suppliers in a framework agreement receive larger shares, but a ranking is not an order.

The 9 lots of Consip's 600-unit electric bus framework agreement: YES-EU ranked first in lot 5.1 and third in lots 2.1 and 4.1
Units · Blue: lots where YES-EU ranked first; dark: lots where it ranked third
Source: Autobusweb reporting on the Consip framework agreement documents; rankings for lots 1.2 and 5.2 were not disclosed
The three lots total 315 units, more than half of the 600-unit framework. Lot 4.1, for 190 12-metre city buses, is the largest of the 9 lots.
The three Consip lots where YES-EU placed in the top three: vehicles, value and ranking
Brackets show the brand of the model bid · amounts are total lot values
LotVehiclesLot valueFirst placeSecond placeThird place
2.190 units, 8 mEUR 88.42 millionPagliani-BascoKarsanYES-EU Italy (CRRC)
4.1190 12-metre city busesEUR 224 millionPagliani-BascoOtokarYES-EU Italy (CRRC)
5.135 18-metre articulated buses, plug-in chargingEUR 51.13 millionYES-EU Italy (CRRC)SolarisDaimler
Source: Autobusweb reporting on Consip framework agreement documents. Pagliani-Basco bid with Zonson and Golden Dragon models
Under the same framework, Yutong ranked first in lot 4.2 (60 12-metre intercity buses) through Powerbus, and King Long bid in several lots through Dierre. None of these bidders has a plant in Italy.
Milan ATM tender for 110 electric buses, scores: KMobility 88.314, BYD Europe 83.271, YES-EU Italy 74.374
Points · combined technical and price score; 7 bidders in total, top three shown
Source: Autobusweb reporting on Milan ATM tender; Sustainable Bus 2026-10
YES-EU scored about 14 points below the winner. KMobility, Karsan's Italian dealer, won with the Karsan e-ATA 12.
Milan ATM tender: 110 12-metre electric buses, estimated value EUR 103 million
Tender issued Mar 2026; contract award announced Oct 28
Vehicles
110 units
80 three-door city buses, 30 two-door suburban buses
Estimated value
EUR 103 million
€103,139,559, including full maintenance
Contract value
EUR 76+ million
Incl. maintenance and battery replacement
Bidder
7 companies
Also Yutong, Solaris, Iveco, Daimler
Sources: Autobusweb; Sustainable Bus; ANSA 2026-10-28
04 / procurement rules

Two EU procurement drafts with origin requirements under review

Neither the YES-EU nor the Adnkronos reports mention public procurement rules. The two drafts below represent the policy environment when YES-EU signed the deal; linking the plant purchase to the drafts is this article's inference. Neither draft has been adopted, and this article could not find the specific origin-content threshold that would apply to buses.

Mar 2026 to 11: sequence of the EU draft procurement rules and the YES-EU contract signing
Draft details per European Parliamentary Research Service briefing, Sep 2026
Mar 4, 2026
European Commission proposes Industrial Accelerator Act
Introduce EU-origin or low-carbon requirements for products, including vehicles, in public procurement and public subsidies.
Sep 9, 2026
European Commission proposes public procurement act
Market access covers countries with procurement commitments to the EU; the brief states the US is covered and China is not. Contracting authorities may reject bids where EU or equivalent content is less than half the contract value.
Sep 17, 2026
IRU and EMTA jointly call for changes to electric bus provisions
Requires that non-EU-origin buses bought and registered before the regulation takes effect remain eligible for public service contracts for their entire service life.
Nov 12, 2026
YES-EU signs preliminary contract for Turin plant
Plans to produce electric buses for Italy and Europe from 2028.
Annual capacity of BYD's Komárom plant in Hungary: about 400 units; expansion to 1250 units announced in Jun 2025
units/year · post-expansion capacity, including electric trucks
Source: electrive 2025-06-30
The Komárom plant has built electric buses for the European market since 2017. The expansion involves about EUR 80 million in investment and roughly 620 new jobs. Capacity at the Turin plant has not been disclosed, so the two cannot be compared directly by scale.
Two bus sellers with plants in the EU: BYD started production in 2017, YES-EU plans to start in 2028
Compiled from electrive and Adnkronos reports
BYD KomáromYES-EU Turin
CountryHungaryItaly
StatusProduction start 2017Preliminary contract; production planned for 2028
FacilityIn-house, expandingPlans to acquire a former Maserati plant; plus an assembly plant of about 7000 square metres in Livorno
Annual capacityApprox. 400 units, expanding to 1250Not disclosed
WorkforceExpansion adds approx. 620 jobsUp to 150 staff at full output
Corporate identityVehicle manufacturerDealers selling CRRC-built electric buses under contract manufacturing
Sources: electrive 2025-06-30; Adnkronos 2026-11-12
05 / Data and sources

Sources for the figures on this page

YES-EU has not issued an official press release; the agreement details come from Adnkronos's report on the day of signing. The company history and delivery volumes come from the YES-EU website and are the company's own claims.

Key figures on this page, what they mean and their sources
Data as of Nov 14, 2026
FiguresMeaningSource
About 230,000 square metresSite area of the former Maserati plant in GrugliascoAdnkronos 2026-11-12
2027 years; 2028 yearsPlanned year for plant conversion; planned year for first production line start-upAdnkronos 2026-11-12
Up to 150 peopleWorkforce at full productionAdnkronos 2026-11-12
About 1400 peoplePeak headcount when the plant built the Maserati Ghibli and QuattroporteAffaritaliani 2026-11-14
Approx. 7000 m²Floor area of YES-EU's plant in Collesalvetti, province of Livorno, Italy, which assembles buses and energy storage systemsYES-EU website news page (company statement)
7 modelsNumber of own-brand electric bus models listed on YES-EU's websiteAutobusweb 2026-11
700+ unitsElectric buses delivered by YES-EU in 2025YES-EU website (company-reported)
600 units; over EUR 650 millionTotal vehicles and value under Consip's electric bus framework agreementAutobusweb
315 unitsCombined vehicle count of the three lots where YES-EU ranked in the top three (90 + 190 + 35)Author's calculations
88.314;83.271;74.374Scores of top three bidders in Milan ATM 110-unit tenderAutobusweb
Approx. 400 units; 1250 unitsBYD Komárom plant: current annual capacity and expansion target, the latter including electric truckselectrive 2025-06-30
Source: see sources in each table row