The EU Horizon Europe-funded MACBETH project has published deliverable D4.1, "Specification and architecture design for multi-point MCS", written by CharIN and Finland's VTT for use at two pilots in Belgium and Sweden. The document reviews more than 40 ISO, IEC and EN standards and identifies four areas not yet covered. The Nordic pilot has 4 MCS charging points and 16 350 kW CCS charging points, with a total output of 3,500 kW. This page organises the published figures in three parts: specification content, pilot power configuration and standardisation progress.
D4.1 is a reference framework and does not prescribe a single design. Chapter 3 presents two site layouts and two power architectures; Chapter 4 sets out four categories of requirements: electrical, communications, cybersecurity, and environment and operations. Most items are checked as yes/no, and availability is one of the few with a numerical value.
The configurations of the two pilots come from the project's public slides from 2025, labelled as high-level requirements or minimum configurations. Milence's site in Temse, Belgium opened on Oct 22, 2026; the press release says it is part of the MACBETH project.
Temse site: 4 × 1,500 + 4 × 400 = 7,600 kW nameplate capacity, 2.1 times the AFIR 2030 core network minimum of 3,600 kW. Milence has not disclosed the site's grid connection capacity.
If all 4 MCS points in the Benelux pilot deliver the maximum 1.2 MW, the total is 4,800 kW, 1,200 kW more than 3,600 kW, before counting the 14 CCS points.
Charging at 1,000 kW for 45 minutes delivers at most 750 kWh (ignoring power tapering as charge level rises). The KPI table in D4.1 includes one item: the share of MCS sessions over 100 kWh completed within 45 minutes.
The Nordic pilot's minimum storage is 1 MW / 1 MWh, enough for 1 hours of full-power discharge, equal to 29% of the 3,500 kW total output.
The three international MCS standards for connectors, supply equipment and communication were published between Jan 2026 and month 8. The four gaps listed in Section 5.2 of D4.1 all lie beyond the single connector.
| Gap | Coverage of existing standards | Open items listed in D4.1 |
|---|---|---|
| Multipoint and shared-power operation | IEC and ISO MCS standards mainly cover single charging sessions with one vehicle per charger; ISO 15118-20 supports energy transfer control | Coordination of multiple ports on a shared power cabinet; notifying vehicles of temporary power limits; consistent behaviour when the grid or site is constrained |
| Automated and robotic plug-in | MCS provides for automation in its geometry and communication; the CharIN white paper lists automatic coupling as optional | Interfaces between charger, vehicle and automatic coupling device; safety concepts for automatic plugging and unplugging; alignment with IEC 61851-27 / 28 |
| Combined CCS and MCS station | CharIN white paper sets detailed MCS hardware and communication requirements | Electrical and safety separation of CCS and MCS; operating rules for shared use by light and heavy vehicles; traffic flow and interface consistency |
| Noise, heat and site-level impact | Thermal limits for connectors, cables and equipment already specified | Cumulative noise, waste heat and cooling-system interactions; D4.1 addresses depot design and layout optimisation |
| Figures | Scope | Source |
|---|---|---|
| >97% | Charger availability requirement | D4.1 Table 3 |
| ≥10% | Cooling capacity as a share of charging power | D4.1 Table 2 |
| 40+ items / 4 sites | Referenced ISO, IEC and EN standards (including those in development); areas not yet fully covered | CharIN 2026-11-12; D4.1, Chapter 5 |
| 3,500 kW | Total charging output of the Nordic pilot: 4 MCS + 16 350 kW CCS; storage of at least 1 MW / 1 MWh | ALICE / MACBETH slides 2025-06 |
| 4 + 14 / 1.2 MW | Minimum charging points in the Benelux pilot; maximum power per MCS connector | ALICE / MACBETH slides 2025-06 |
| 1,500 / 400 kW | Maximum power of 4 MCS/CCS combined chargers and 4 CCS chargers at Milence Temse | Milence 2026-10-22 |
| 3,600 kW / 60 km | Minimum requirements and maximum spacing for heavy-duty charging stations on the TEN-T core network by end-2030 | Regulation (EU) 2023/1804, Article 4 |
| 3,750 kW | MCS specification ceiling: 1,250 V, 3,000 A | CharIN 2026-11-12 |
| 750 kW | Maximum charging power of MAN's first series-production MCS trucks | MAN 2026-07-30 |
| 4,500 kW / 15 t | Rated maximum power of the truck with Fraunhofer IVI's underbody charging system; vehicle tested in Dresden | Fraunhofer IVI website; press release 2025-05-22 |
| 5,120 / 205,857 units | Rechargeable models vs. total registrations among EU heavy trucks, 1–9 2026 | ACEA 2026-10-28 |