↑Back to top
EU · Electric heavy trucks · Megawatt charging Published by CharIN Nov 12, 2026

MACBETH project publishes multi-point megawatt charging station specification D4.1: two site layouts, two power architectures, four gaps in standards

The EU Horizon Europe-funded MACBETH project has published deliverable D4.1, "Specification and architecture design for multi-point MCS", written by CharIN and Finland's VTT for use at two pilots in Belgium and Sweden. The document reviews more than 40 ISO, IEC and EN standards and identifies four areas not yet covered. The Nordic pilot has 4 MCS charging points and 16 350 kW CCS charging points, with a total output of 3,500 kW. This page organises the published figures in three parts: specification content, pilot power configuration and standardisation progress.

CharIN press release · 2026-11-12 MACBETH D4.1 (cover date 2026-11-05, status: Draft) ALICE / MACBETH project slides · 2025-06 Regulation (EU) 2023/1804, Article 4 Milence press release · 2026-10-22 ACEA · 2026-10-28
Total charging output of the Nordic pilot
0 kW
4 MCS + 16 350 kW CCS
Charger availability requirement
0% or more
D4.1, Table 3, No. S4.2
Standards mapped to D4.1
0 multiple items
ISO、IEC、EN
What the standard does not yet cover
0 locations
Power arbitration, automated connection, mixed stations, noise and waste heat
01 / specification

What D4.1 says

D4.1 is a reference framework and does not prescribe a single design. Chapter 3 presents two site layouts and two power architectures; Chapter 4 sets out four categories of requirements: electrical, communications, cybersecurity, and environment and operations. Most items are checked as yes/no, and availability is one of the few with a numerical value.

MACBETH D4.1 specification at a glanceSpecification and architectural design of multipoint MCS · Lead editor CharIN, co-authored by VTT · 33 pages
Site layout
2 types
Drive-through; dedicated waiting area
Electrical architecture
2 types
Shared power cabinet; modular multi-cabinet
Charger availability
>97%
Table 3, S4.2
Cooling capacity
≥10% of charging power
Table 2, S7.2; winter heating elements also required
Vehicle-charger communication
ISO 15118-20
MCS configuration, physical layer 10BASE-T1S
Safety baseline
TLS 1.3
Two-way vehicle–charger authentication; per IEC 62443, ISO/IEC 27001
Sources: MACBETH D4.1, chapters 3 and 4; CharIN press release 2026-11-12
2 site layouts for D4.1: drive-through and with waiting area
Schematic · drawn from the text of D4.1, sections 3.1 and 3.2; not the original figure
Drive-through Forward only, no reversing Drive inDrive out MCS With dedicated waiting area Queued, then released as bays free up Waiting area Vacant
Source: MACBETH D4.1, sections 3.1 and 3.2; original figure from the HoLa project
▸ D4.1 specifies that drive-through MCS chargers are placed on the vehicle's left side, with CCS added as needed for mixed or overnight charging. Layouts with waiting areas require more complex on-site traffic planning; the document assigns them to heavy-truck charging hubs where demand keeps growing.
D4.1's 2 power architectures: shared power cabinet vs. modular multi-cabinet
Schematic · drawn from the text of D4.1, sections 3.3 and 3.4; not the original figure
Shared power cabinet One centralised power converter, dynamically allocated Grid Centralized power cabinetDemand · priority · grid limit 4 charging points Modular multi-cabinet Each cabinet serves one or a few charging points; capacity is added by adding cabinets Grid Power cabinetPower cabinetAdditional cabinets later Initially 1–2 charging points
Source: MACBETH D4.1, sections 3.3 and 3.4
▸ D4.1 describes shared power cabinets as making full use of constrained grid connections and reducing duplicated hardware; it describes modular multi-cabinet setups as prioritising step-by-step expansion, redundancy and layout flexibility, with power-sharing efficiency secondary. Both architectures reserve interfaces for automated connection devices.
97% availability means at most about 263 hours of downtime out of 8,760 hours a year
hours · per charge point · based on 8,760 hours per year
Source: MACBETH D4.1 Table 3 (S4.2 uptime >97%); hours calculated by this page
▸ 8,760 × 3% ≈ 263 hours, or about 11 days. D4.1 does not define how availability is measured (per charge point or per station, or whether planned maintenance is excluded); the pilot's monitoring requirements include a per-connector status time series, with a recommended granularity of 1 minutes.
02 / power

Power configuration at pilot and operational sites

The configurations of the two pilots come from the project's public slides from 2025, labelled as high-level requirements or minimum configurations. Milence's site in Temse, Belgium opened on Oct 22, 2026; the press release says it is part of the MACBETH project.

Nordic pilot: 16 CCS nameplates totalling 5,600 kW, total output 3,500 kW
kW · high-level requirement for the Nordic pilot
Source: ALICE / MACBETH project slides (2025-06); totals calculated on this page
▸ 16 × 350 = 5,600 kW, 3,500 ÷ 5,600 ≈ 0.63. The slide does not give the per-port power of the 4 MCS charging points, so they are not included. The same page states that MCS and CCS are physically separated but share DC capacity with prioritisation.
Charge points: Nordic pilot 4+16, Benelux pilot 4+14, Temse 4+4
MCS and CCS charging points
Sources: ALICE / MACBETH slides; Milence press release 2026-10-22; Fraunhofer ISI HoLa report 2024-03
▸ HoLa's 8 MCS and 10 CCS points are spread across 5 sites on Germany's A2 corridor. Each of the 4 sites with MCS has 2. The 4 MCS points at Temse are combined MCS/CCS chargers. The Benelux pilot figures are minimum configurations.
AFIR minimum power for heavy-duty charging stations: 1,400 kW in 2025, 3,600 kW on the core network in 2030
kW · per charging station · per direction of travel · dashed line = 4 × 1,000 kW
Source: Regulation (EU) 2023/1804, Article 4(1)(a), (b) and (c)
▸ Requirements cover at least 15% of the TEN-T network length by end-2025, at least 50% by end-2027, and a charging station every 60 km on the core network by end-2030. Each tier also requires 1 to 2 charging points of at least 350 kW per pool. The regulation does not mandate MCS.
Power per charging point: CCS 350 kW, MCS specification maximum 3,750 kW
kW · highest rated value per source
Sources: CharIN 2026-11-12; MAN 2026-07-30; ALICE slides; Milence 2026-10-22; Fraunhofer IVI website
▸ MCS ceiling = 1,250 V × 3,000 A. CharIN says a peak of about 1,000 kW should be roughly enough to fully charge a truck during the 45-minute statutory break. The Fraunhofer IVI figure is the rated value on the website for an automated underbody charging system, a different interface.

Calculating nameplate ratings against minimums

Temse site: 4 × 1,500 + 4 × 400 = 7,600 kW nameplate capacity, 2.1 times the AFIR 2030 core network minimum of 3,600 kW. Milence has not disclosed the site's grid connection capacity.

If all 4 MCS points in the Benelux pilot deliver the maximum 1.2 MW, the total is 4,800 kW, 1,200 kW more than 3,600 kW, before counting the 14 CCS points.

Charging at 1,000 kW for 45 minutes delivers at most 750 kWh (ignoring power tapering as charge level rises). The KPI table in D4.1 includes one item: the share of MCS sessions over 100 kWh completed within 45 minutes.

The Nordic pilot's minimum storage is 1 MW / 1 MWh, enough for 1 hours of full-power discharge, equal to 29% of the 3,500 kW total output.

03 / standard

Standards progress and gaps

The three international MCS standards for connectors, supply equipment and communication were published between Jan 2026 and month 8. The four gaps listed in Section 5.2 of D4.1 all lie beyond the single connector.

MCS from publication to site specification: Jun 2022 to Nov 2026
Milestones for standards, regulation and demonstration projects
2022-06-14
CharIN officially launches MCS at EVS35 in Oslo
Demonstrated on site with an Alpitronic charger and a Scania truck.
2023-09-22
AFIR published in the Official Journal of the EU
Article 4 sets minimum power and maximum spacing for heavy-duty vehicle charging stations.
2025-02
MACBETH project launch
Horizon Europe, coordinated by VTT; budget about EUR 10.2 million, including about EUR 8.4 million in EU funding; ends Jan 2029.
2025-09-29
Germany's first public MCS charge point opens
HoLa project, A2 motorway, Lipperland Süd, up to 1.2 MW.
2026-01-28
IEC TS 63379 published
Connectors, vehicle inlets and cable assemblies.
2026-07-17
ISO 15118-20 revision published 1
The MCS communication process has been written into the standard; CharIN announced it the same day.
2026-08-21
IEC published 61851-23-3
MCS charging equipment. In Jul 30, MAN announced its first series-production truck with MCS, rated at up to 750 kW.
2026-10-22
Milence Temse hub opens
8 bays, 4 MCS/CCS combined chargers of up to 1,500 kW.
2026-11-12
CharIN publishes MACBETH D4.1
Layout, power architecture and technical requirements for multi-point MCS stations; cover dated Nov 5, status: Draft.
4 standards gaps listed in D4.1
D4.1 Section 5.2 · Coverage of existing standards
GapCoverage of existing standardsOpen items listed in D4.1
Multipoint and shared-power operationIEC and ISO MCS standards mainly cover single charging sessions with one vehicle per charger; ISO 15118-20 supports energy transfer controlCoordination of multiple ports on a shared power cabinet; notifying vehicles of temporary power limits; consistent behaviour when the grid or site is constrained
Automated and robotic plug-inMCS provides for automation in its geometry and communication; the CharIN white paper lists automatic coupling as optionalInterfaces between charger, vehicle and automatic coupling device; safety concepts for automatic plugging and unplugging; alignment with IEC 61851-27 / 28
Combined CCS and MCS stationCharIN white paper sets detailed MCS hardware and communication requirementsElectrical and safety separation of CCS and MCS; operating rules for shared use by light and heavy vehicles; traffic flow and interface consistency
Noise, heat and site-level impactThermal limits for connectors, cables and equipment already specifiedCumulative noise, waste heat and cooling-system interactions; D4.1 addresses depot design and layout optimisation
Source: MACBETH D4.1, sections 5.2.1–5.2.4
▸ D4.1 states that these gaps do not prevent pilot deployments, but need further validation through projects such as MACBETH and the work of standardisation bodies. Section 5.3 also mentions harmonisation of grid connection codes (RfG, NC DCC).
EU heavy trucks in the first three quarters: 205,857 units, of which 5,120 electrically chargeable
Each cell = 0.5% · 16 t and above · 2026 registrations, months 1–9
Plug-in models (BEV and PHEV): 5,120 unitsRemaining 200,737 units
Source: ACEA press release 2026-10-28
▸ 5,120 ÷ 205,857 ≈ 2.5%, versus 3,203 units a year earlier. ACEA's category includes plug-in hybrids and is not BEV-only. Across all trucks, rechargeable models totalled 12,873 units, a 5.3% share.
MACBETH budget about EUR 10.2 million, EU funding about EUR 8.4 million
× EUR 10,000 · Feb 2025 – Jan 2029
Sources: CharIN press release 2026-11-12; CORDIS project 101192466
▸ 840 ÷ 1,020 ≈ 82%. The project involves 19 organizations, with Kempower, Power Electronics, Rocsys and Milence on equipment and operations, and MAN as an associated partner. Germany's HoLa project received EUR 12 million in federal funding.
Data quick reference
Figures · definitions · sources
FiguresScopeSource
>97%Charger availability requirementD4.1 Table 3
≥10%Cooling capacity as a share of charging powerD4.1 Table 2
40+ items / 4 sitesReferenced ISO, IEC and EN standards (including those in development); areas not yet fully coveredCharIN 2026-11-12; D4.1, Chapter 5
3,500 kWTotal charging output of the Nordic pilot: 4 MCS + 16 350 kW CCS; storage of at least 1 MW / 1 MWhALICE / MACBETH slides 2025-06
4 + 14 / 1.2 MWMinimum charging points in the Benelux pilot; maximum power per MCS connectorALICE / MACBETH slides 2025-06
1,500 / 400 kWMaximum power of 4 MCS/CCS combined chargers and 4 CCS chargers at Milence TemseMilence 2026-10-22
3,600 kW / 60 kmMinimum requirements and maximum spacing for heavy-duty charging stations on the TEN-T core network by end-2030Regulation (EU) 2023/1804, Article 4
3,750 kWMCS specification ceiling: 1,250 V, 3,000 ACharIN 2026-11-12
750 kWMaximum charging power of MAN's first series-production MCS trucksMAN 2026-07-30
4,500 kW / 15 tRated maximum power of the truck with Fraunhofer IVI's underbody charging system; vehicle tested in DresdenFraunhofer IVI website; press release 2025-05-22
5,120 / 205,857 unitsRechargeable models vs. total registrations among EU heavy trucks, 1–9 2026ACEA 2026-10-28
Sources: see each row. Totals, ratios and hours calculated by this page.
Sources: D4.1 content is taken from the original PDF attached to the CharIN press release; its cover status is Draft. Configurations for the two pilots come from the project's Jun 2025 slides. They are high-level requirements or minimum configurations, so the parameters as built may differ. The two diagrams are drawn from the text of D4.1 and do not show actual sites. Charging power and test vehicles for Fraunhofer IVI's underbody charging are taken from the institute's website and 2025 press releases.