Daimler Buses showed a near-production prototype of the new-generation Mercedes-Benz eCitaro at the eMobility Days in Munich. It is the company's first city bus developed from scratch as battery-electric, and will launch in Europe in 2028. The same press release backs the EU requirement for 90% zero-emission city buses by 2030, while calling for the target year for a 43% emissions cut for intercity buses and coaches to be moved from 2030 to 2033. Daimler's rationale is that public charging infrastructure is at least three years behind.
The current eCitaro is based on the platform of the combustion-engine Citaro. The next generation is being developed under Mannheim's lead and will be built in Germany, France and the Czech Republic, the same production footprint as the current model. Daimler Buses plans to offer only electric city buses in its European new-vehicle business from 2030.
| Item | Current eCitaro | New-generation eCitaro |
|---|---|---|
| Launch | 2018 | 2028 |
| Platform | Carried over from the diesel Citaro | First developed from scratch as a BEV |
| Batteries | NMC, 111 kWh per pack in the latest generation | LFP, about 50 kWh per pack |
| Drivetrain | — | Low-floor version: wheel-hub motors; low-entry version: central motor |
| Production | Germany, France, Czech Republic; R&D led by Mannheim | |
| Cumulative deliveries | Over 4,600 units in Europe | World premiere at Busworld Brussels, Oct 2027 |
Daimler Buses wrote in a press release that, by its own analysis, two-thirds of city buses sold in Europe in 2025 were electric, without specifying the geographic scope or methodology. Environmental group Transport & Environment (T&E) covers the EU-27, while DVV Media Group covers the EU plus the UK, Norway, Switzerland and other countries.
City buses are assessed against a minimum share of zero-emission vehicles (Article 3d), while intercity buses and coaches are assessed on the reduction in new-vehicle CO₂ emissions relative to the reference period (Annex I, Table 4.3.1). The European Commission must complete a review of the regulation by Dec 31, 2027, covering zero-emission heavy-duty vehicle registrations and progress on charging infrastructure.
City bus operators can install charging at their own depots and schedule charging into duty rosters. Intercity buses and tour coaches often travel to destinations beyond motorway corridors and need public charging along the route and at the destination.
| Item | Mercedes-Benz eIntouro | MAN Lion's Coach 14 E |
|---|---|---|
| Segment | Intercity buses | Touring coach (three-axle) |
| Rated range | Up to 500 km | Up to 650 km |
| Batteries | — | Up to 534 kWh, NMC |
| Charging | — | CCS up to 375 kW, prepared for megawatt charging |
| Progress | Unveiled at end of 2025; first customer deliveries Nov 2026 | Production starts in Ankara at end of 2026 |
| Manufacturer's claims on charging | Daimler Buses Solutions is building public charging stations in Hamburg, Cologne and Munich | Short- and medium-haul routes with depot charging are best suited to electric coaches |
The subsidy comes from the Climate and Transformation Fund and is for buying alternative-drive buses. It is currently a draft budget and has not yet been voted on by the Bundestag. Germany's public transport association VDV and Klima-Allianz commissioned PwC to produce estimates, and Daimler Buses called in a press release for the subsidy to stay at current levels.
| Figures | Scope | Source |
|---|---|---|
| 2028 years; 4,600+ units | European launch year of the new-generation eCitaro; cumulative European deliveries of the current model since 2018 | Daimler Truck press release 2026-11-10 |
| Two-thirds | Daimler Buses' own analysis: share of electric vehicles among city buses sold in Europe in 2025; geographic scope and powertrain definition not specified | Daimler Truck press release 2026-11-10 |
| 60%;56% | Share of zero-emission, battery-electric buses in new EU city bus registrations, 2025 | Transport & Environment (via Sustainable Bus) |
| 61.2% | BEV share of European city buses in H1 2026: 7,480 vs 12,215 units, excluding trolleybuses | DVV Media Group (via Sustainable Bus) |
| 90%;43% | Minimum zero-emission share for city buses in 2030; CO₂ reductions for intercity buses and coaches in 2030–2034 | Regulation (EU) 2024/1610 |
| 590 units; 267 units | Registrations of battery-electric intercity buses and electric touring coaches over 8 tonnes in Europe, 2025; total of 11,607 units is the first-release figure | DVV Media Group (via Sustainable Bus) |
| Approx. 30,000; approx. 98% | Daily charging sessions needed by intercity buses and touring coaches in 2030; share not located on TEN-T core corridors | ACEA position paper |
| 35,000; over 14,000 | Heavy-duty charging points needed on Europe's main corridors in 2030; additional bus and coach charging points needed. Daimler citing ACEA | Daimler Truck press release 2026-11-10 |
| 403 million; EUR 130 million | German federal purchase subsidy for alternative-drive buses, 2026 and 2027 draft budgets | ecomento 2026-07-22;ZfK |
| 580,000; EUR 310,000 | Approximate purchase prices of electric and diesel solo buses in Germany | PwC study (reported by ZfK) |