Of the 418 vehicles in Frankfurt's bus network, 109 already run on locally zero-emission drives: 77 battery-electric and 32 fuel cell, an electrification rate of 26%. The same announcement states that municipal operator ICB will deploy 52 conventional diesel buses as a stopgap until a new electric depot in the west opens. The target for a fully zero-emission fleet is 2033; in 2018, the stated target was 2030. The new depot is to be electrically sized for about 250 electric buses, so the pace of conversion will depend mainly on construction timelines for depots and grid connections.
For the 2026 timetable year, Transdev Rhein-Main (TDRM) has put 9 Ebusco battery-electric buses into service on routes 56 (Rödelheim–Sossenheim–Eschborn) and 71 (Praunheim, Nordweststadt), taking Frankfurt's zero-emission bus fleet past 100 vehicles. The buses charge at the Heddernheim waste-to-energy combined heat and power plant (MHKW), and FES's Heddernheim workshop handles their maintenance.
| Item | Content | Source |
|---|---|---|
| Operator | Transdev Rhein-Main GmbH(TDRM) | City government notice |
| Vehicles | 9 Ebusco battery-electric city buses entering service this timetable year | City government notice |
| Route | Route 56: Rödelheim–Sossenheim–Eschborn; Route 71: Praunheim, Nordweststadt | City government notice |
| Charging power supply | Heddernheim waste-to-energy CHP plant, operated by FES and Mainova | City government notice |
| Renewable share | The plant's recent renewable electricity share is about 47%, not 100% green power | electrive |
| Maintenance | FES vehicle workshop in Heddernheim | City government notice |
ICB plans to build a western electric bus depot on Lorscher Straße in Rödelheim to replace the Römerhof depot, providing parking and charging for 200 battery-electric and hydrogen buses. Document M 146, submitted by the city government to the city council on Oct 23, states that the new depot's charging facilities are sized for about 250 electric buses. This requires pulling 4 sets of 10 kV cables through an existing culvert beneath the railway and Lorscher Straße that already carries 110 kV cables, and a cherry tree at the culvert entrance will have to be felled.
Spread over the 7 years from 2027 to 2033, about 44 vehicles need replacing each year. Announced plans: western Lot B adds 10 electric rigid buses from 2027, the east buys 39 in 2028, and from Dec 2028 6 minibus lines in Lot H switch to all-electric operation. traffiQ managing director Tom Reinhold said electric bus operating costs are already about 40% lower than comparable diesel buses, with a range of 250 to 300 km per charge.
| Time | Event | Type |
|---|---|---|
| 2026-08 | Potsdam's ViP terminates its contract with Ebusco for 23 battery-electric buses after repeated delivery delays | Order cancellations |
| 2026-08-17 | H1 revenue EUR 22 million, vs EUR 28.2 million a year earlier | Operating data |
| 2026-08-19 | EUR 6 million in short-term liquidity from existing shareholders | Financing |
| 2026 timetable year | TDRM deploys 9 Ebusco buses in Frankfurt; Transdev operates 25 Ebusco buses there in total | Delivered |