Germany · electric heavy trucks · bidirectional charging SPIRIT-E project results · 2026-10-30

MAN electric heavy truck bidirectional charging trial: eTGX feeds up to 350 kW to the depot and the grid

The SPIRIT-E research project led by the Technical University of Munich (TUM) published its results on Oct 30. A MAN eTGX with 480 kWh of usable energy, at the depot of logistics company Schmid near Regensburg, fed power at up to 350 kW via an SBRS bidirectional DC charger into the depot's internal grid and the public grid, and charged other vehicles. The project estimates that smart scheduling can cut depot energy costs by about 10% on average and by up to 20%. Electricity trading was tested only in a simulated environment; German grid and metering operators must implement new billing rules for bidirectional charging by the end of Sep 2027 at the latest.

Sustainable Truck & Van · 2026-10-30 IAA Transportation newsroom · 2026-04-28 / 06-02 Automotive World · 2026-04-28 electrive · 2025-11-14 pv magazine · 2026-10-02 The Mobility House · 2025-11-18
Maximum power delivery
0 kW
eTGX via SBRS bidirectional DC charger
Usable battery capacity of test vehicle
0 kWh
Discharged in about 1.4 hours at 350 kW (calculated on this page)
Energy cost reduction (project estimate)
0% cap
Average about 10%; an estimate, not a guarantee
Deadline for German operators to comply
0, end of month 9
Federal Network Agency MiSpeL rules
01 / trial

SPIRIT-E trial: 480 kWh eTGX, up to 350 kW bidirectional DC power export

The three-year project ended in Oct 2026 and ran as a "real-world laboratory" at a Spedition Schmid logistics depot. All three use cases were demonstrated: powering the depot (V2S), charging another vehicle (V2V) and feeding power into the public grid (V2G). Vehicle-to-charger communication used ISO 15118-20, the standard that defines the information exchange required for bidirectional energy flow.

MAN eTGX feeding power back to the grid in the SPIRIT-E project
Image: MAN Truck & Bus (via Sustainable Truck & Van, 2026-10-30)
MAN eTGX electric tractor connected to a bidirectional charger
Image: MAN Truck & Bus. The trial took place at Spedition Schmid's depot in Obertraubling near Regensburg, with the charger supplied by Shell subsidiary SBRS.
480 kWh discharged at a constant 350 kW: fully depleted in about 1.4 hours
Remaining usable energy · kWh · Linear estimate based on maximum discharge power; this page's calculation
Source: Sustainable Truck & Van, 2026-10-30 (480 kWh, 350 kW); discharge time calculated as 480 ÷ 350
▸ In practice, discharging won't hold maximum power throughout or drain the battery, since the vehicle needs charge left for its next run. This line only indicates the order of magnitude: at full power it would discharge in about 1.4 hours, and heavy trucks park for several hours overnight, so time isn't the bottleneck; the energy needed for the next day's run must first be deducted from what can be discharged.
The SPIRIT-E consortium has eight members: OEMs, universities, grid operators, charger companies and energy management providers
Consortium members disclosed in MAN's press release of Apr 28, 2026
MembersTypeRole in the project
Technical University of Munich (TUM)UniversitiesConsortium lead
MAN Truck & BusOEMSupplies eTGX test trucks, advancing series-production rollout
SBRS(Shell)Charging equipmentBidirectional DC charger
TenneTTransmission system operatorGrid side
HubjectCharging interoperability platformCharging communication and billing interoperability
Consolinno EnergyEnergy managementDepot energy management
Fraunhofer IEEResearch institutionEnergy systems research
Research Center for Energy Economics (FfE)Research institutionEnergy economics modelling
Source: IAA Transportation newsroom, 2026-04-28; Automotive World, 2026-04-28
▸ Besides the trucks, the same system connects charging systems, depot energy management software, power trading platforms and grid operators. At volume, fleets will have to deal with this entire chain.
SPIRIT-E's three use cases and how they were tested: V2S, V2V and V2G demonstrated on real vehicles; power trading simulated
Compiled from disclosed project results
UsageWhere the power goesTest method
V2S vehicle-to-siteDepot's internal grid: peak shaving, higher solar self-consumption, support for building powerReal vehicle powers a building overnight
V2V (vehicle-to-vehicle)Charging another vehicleIn practice Truck battery charges an electric car
V2G vehicle-to-gridFeeding the public grid when prices are high, or supporting grid stabilityReal vehicle feeds power into the public grid
Power tradingCharge when cheap, sell when expensiveSimulated not run as a commercial service
Source: Sustainable Truck & Van, 2026-10-30; IAA Transportation newsroom, 2026-04-28
▸ All three power delivery modes have been proven at real depots. The only one still in a simulated environment is power trading, the link where fleets earn revenue directly.
SPIRIT-E project elementsGerman research project, three years, ending Oct 2026
Usable capacity
480 kWh
MAN eTGX electric tractor
Maximum power delivery
350 kW
SBRS bidirectional DC charger
Consortium members
8 companies
Led by TUM, incl. TenneT and Hubject
Project duration
Year 3
Results published Oct 2026
Communication standard
15118-20ISO
Specifies information exchange for bidirectional energy flow
First public demonstration
04-242026
Schmid depot; MAN says it is the first European commercial vehicle maker to demonstrate it
Source: Sustainable Truck & Van 2026-10-30; IAA Transportation newsroom 2026-04-28
02 / savings

Project estimate: depot energy costs fall by about 10% on average, and by up to 20% under favourable conditions

The project team stresses that the savings are estimates, not guaranteed results. Actual returns depend on electricity prices, annual mileage, depot charging infrastructure, downtime and on-site renewable energy. The researchers consider the best fit to be electric trucks that cover less than 100,000 km a year on regional routes and return to the same depot every day.

Estimated energy cost savings: about 10% on average, up to 20%
% · SPIRIT-E project estimate
Source: Sustainable Truck & Van, 2026-10-30; MAN's figure on 2026-04-28 is 10%–20%
▸ The wide range of reductions shows that savings depend heavily on depot conditions: depots with solar, long dwell times and volatile power prices come closer to 20%.
Electric truck driving 100,000 km a year: 10% equals about 10,000 km, 20% about 20,000 km of electricity costs
km/year · 20% = 20,000 km is MAN's basis; 10% = 10,000 km is converted on the same basis on this page
Source: Automotive World citing MAN, 2026-04-28; 10,000 km derived as 100,000 × 10%
▸ MAN pitches the savings to fleets as "free driving", based on an annual mileage of 100,000 km; that happens to be the upper limit of applicability set by the researchers, so long-haul trucks running further fall outside the main scope.
Five conditions affecting savings, and the vehicles the project identifies as suitable
Compiled from disclosed project results
ConditionsImpact on savings
Electricity priceThe wider the peak/off-peak price gap, the more room for peak shaving and low-cost charging
Annual mileageApplies to vehicles driving under 100,000 km a year
Depot charging infrastructureRequires bidirectional chargers and a depot energy management system
Parked timeTime parked at the depot is time when charging can be scheduled
On-site renewable energyWith solar, self-consumption share can be raised
Applicable vehiclesRegional routes, return to the same depot daily, predictable schedules
Sources: Sustainable Truck & Van, 2026-10-30; Automotive World, 2026-04-28
▸ Selling power back is still at simulation stage. Once the production version launches, fleets will first benefit from depot self-consumption and peak shaving; regional distribution fleets that return to base daily will be the first to use it.
Four barriers to series production cited by project partners
SPIRIT-E project partners, 2026-10-30
Source: Sustainable Truck & Van, 2026-10-30
▸ Of the four barriers, only standardisation concerns the vehicle and charger; the other three lie outside the vehicle. MAN says it is moving bidirectional charging into series production but gave no date.
03 / Rules

Germany's bidirectional charging billing rules: grid fees waived from Jan 1, 2026; operators to implement MiSpeL by end-Sep 2027

Before the amendment, Germany treated EVs as vehicles, not storage. Drawing power from the grid incurred grid fees and electricity tax, and feeding it back and recharging incurred them again, so V2G electricity was effectively charged twice. The energy law amendment passed by the Bundestag on Nov 13, 2025 exempts electricity that is stored and fed back into the same grid from grid fees and electricity tax. The exemption covers both stationary storage and bidirectional-charging EVs.

German bidirectional charging rules and heavy-truck bidirectional charging demo milestones: Nov 2025 to Sep 2027
2025-11-13
Bundestag passes energy law amendment
Electricity stored and fed back into the same grid is exempt from grid fees and electricity tax; applies to bidirectional-charging EVs.
2026-01-01
Grid fee reduction takes effect
Grid operators are expected to need 6 to 12 months to adjust their systems.
2026-04-24
First public demonstration of SPIRIT-E
Powers buildings and charges electric cars overnight.
H1 2026
Scania MCS bidirectional demo
Charging and discharging at up to 1000 A and 750 kW.
2026-10-01
Federal Network Agency finalises MiSpeL
Bidirectional chargers are in principle treated as energy storage; electricity fed back to the grid is subject to lower levies and grid fees.
2026-10-30
SPIRIT-E results published
Up to 350 kW fed back to the grid; estimated energy cost savings of 10%–20%.
End of 2027-09
MiSpeL implementation deadline
Grid and metering operators must complete implementation; during the transition, it can be used early if both parties agree.
Source: electrive 2025-11-14; The Mobility House 2025-11-18; pv magazine 2026-10-02; IAA Transportation newsroom; Sustainable Truck & Van 2026-10-30
Grid fees and electricity tax on V2G power: before vs after the amendment
Germany, compiled from electrive and The Mobility House
StageBefore amendmentFrom 2026-01-01
Charging from the gridSubject to grid fees and electricity taxNo charges on power fed back after storage
Fed back to the grid, then rechargedPaid twiceTreated as stored energy; no double charging
Role of the EVVehiclesTreated the same as stationary storage
Metering and billingNo specific rulesMiSpeL: bidirectional chargers treated as storage; operators to implement by end-Sep 2027
Sources: electrive, 2025-11-14; pv magazine, 2026-10-02
▸ This amendment removes double charging on V2G electricity. Now that the rule is written into law, when fleets can actually settle under the new rules depends on how quickly the grid and metering operators serving their depots implement it.
Germany smart meter penetration about 3% (Nov 2025)
Share of households and related connection points with a smart metering system
Source: The Mobility House, 2025-11-18
▸ MiSpeL settlement relies on metering that separates stored energy from ordinary consumption. Low smart meter coverage is a hurdle to clear before the rules reach charging sites.
Heavy-truck bidirectional charging demo power: MAN 350 kW, Scania MCS 750 kW
kW · MCS long-term planned ceiling 3750 kW
Sources: Sustainable Truck & Van 2026-10-30; IAA Transportation newsroom 2026-06-02; 750 ÷ 350 ≈ 2.1x calculated on this page
▸ The two companies achieved the same thing through different interfaces, with first applications at depots. Fleets should confirm before purchasing that vehicles, chargers and depot energy systems use the same protocol.
04 / Quick data

Figures, definitions and sources

FiguresScopeSource
480 kWhUsable battery capacity of eTGX test vehicleSustainable Truck & Van,2026-10-30
350 kWMaximum power fed back via SBRS bidirectional DC chargerSustainable Truck & Van,2026-10-30
Approx. 1.4 hours480 ÷ 350: time to fully discharge at maximum powerConversions on this page
About three years · ends 2026-10SPIRIT-E project durationSustainable Truck & Van,2026-10-30
8 companiesTotal consortium members (incl. TUM, MAN)IAA Transportation newsroom, 2026-04-28
About 10% / up to 20%Depot energy cost reduction, project estimateSustainable Truck & Van,2026-10-30
20,000 kmFor a vehicle covering 100,000 km a year, the 20% saving expressed as equivalent driving distanceMAN, via Automotive World
Under 100,000 kmAnnual mileage of eligible vehiclesSustainable Truck & Van,2026-10-30
2025-11-13Bundestag passes energy law amendmentelectrive,2025-11-14
2026-01-01Grid fee reduction takes effectThe Mobility House,2025-11-18
6–12 monthsTime needed for grid operators to adjust their systemsThe Mobility House,2025-11-18
About 3%Smart meter coverage in GermanyThe Mobility House,2025-11-18
End of Sep 2027MiSpeL implementation deadlinepv magazine,2026-10-02
1000 A / 750 kWScania MCS bidirectional charging demoIAA Transportation newsroom, 2026-06-02
3.75 MWLong-term MCS power ceilingIAA Transportation newsroom, 2026-06-02