↑Back to top
CATL global share
0%
2025 · 465 GWh installed
EU battery imports
€0
2023 · 90% from Asia
European domestic control
0%
EU capacity · 75% Korean-owned
PowerCo phase 1
0 GWh
Salzgitter · Dec 2025
ACC cancelled projects
0
Kaiserslautern + Termoli
EU Battery Booster
€0
Zero-interest loan · Dec 2025

Timeline of five flagship projects' fates

Project lifecycle Gantt timeline
Five strategic projects under three major OEMs
Three cancelled

Cellforce (Porsche): The high-performance, low-volume route has no scale: luxury brand volumes can't support large cell investments, and 200 layoffs confirm the bet has failed. ACC cancels both lines: A JV platform cannot align chemistry roadmaps with the pace of end demand; "freeze → review → cancel" is structurally inevitable, not the result of a single management error.

Progress towards European battery strategy targets
Estimated progress against plans set in 2030
Severely lagging

Project cancellation rate above 50%. With three flagship companies pulling out, the gap to domestic capacity targets keeps widening. What Europe ends up with is a European version of the Asian supply chain, not a revival of home-grown brands.

Key cost comparison (relative to baseline)
Asia's best = 100; relative levels for Europe
Cost disadvantage
All-in battery production cost in Europe~165
Asian benchmark (= 100)100
Europe's relative energy cost premium+40%
EU Battery Booster funding€1.8bn
China's share of EU battery imports87%
Three-way capability radar
PowerCo vs CATL vs LG Energy Solution
Capability comparison

465 GWh vs 20 GWh: the gap is beyond catching up

Global battery market share treemap, 2025
Area proportional to installed capacity (GWh)
Market landscape

CATL dominates: its 465 GWh of installations equals 23 times the full-capacity target of Europe's PowerCo. The three Korean suppliers together hold about 22% and are the main alternative to CATL for European OEMs. European homegrown brands barely show up on the share chart, and since Northvolt's bankruptcy even their last symbolic presence is gone.

Control of battery capacity within the EU
By company headquarters country
75% Korean firms

Only 15% of production capacity in the EU is managed by European companies, while 75% is in the hands of Korean companies. Even if local-content policies bring more capacity to Europe, the first to benefit will be Asian leaders that already have global manufacturing capabilities.

The "Made in Europe" label has decoupled from technological leadership

Supply chain density: number of suppliers per component category
Source: Grob / VDMA industry assessment
Density gap
20Asian suppliers (per component category)
2–3European suppliers (per component category)
Supplier density determines bargaining power, backup redundancy and the speed of process iteration. With 2–3 suppliers, any single failure can bring down the whole line; with 20, there is continuous price pressure, substitution and rapid adoption of new processes. Beyond building plants, European battery projects must also solve this, and so far they have not.
Battery cell manufacturing cost structure
Cathode and anode together account for 60%; Asia dominates pricing
Cathode 50%

Cathode active material accounts for about 50% of cell manufacturing cost and anode for about 10%, both with supply and pricing dominated by Asia. Zero-interest loans cut financing costs but cannot change the cost floor set by materials.

Sources of European battery imports
Total imports of about €27 billion in 2023
China 87%
Battery cells as share of vehicle value (up to 40%)
Controlling the cells = controlling vehicle pricing power and margins
Strategic weight

Battery cells account for up to 40% of vehicle value. Whoever controls the cells controls vehicle gross margin and specification strategy, which is why European OEMs cannot cut their share of externally sourced cells.

The real winners of local content rules aren't necessarily European companies

Local-content policy scenario analysis
Switch policy levels to see how the distribution of beneficiaries changes
Interactive chart
Shallow policy (only the battery pack must be localised): the firms best able to respond quickly are CATL, BYD and LG Energy Solution. They are good at copying production models proven at home into new markets, bringing their cost curves and supplier networks along. European companies have no structural advantage.
Ceiling on competitiveness gains from policy tools
Cost competitiveness improvement by policy instrument (% estimate)
Limited effectiveness

The EUR 1.8 billion zero-interest loan can ease cash-flow pressure but cannot change the material cost structure: cathode materials make up 50% of costs and Asia dominates pricing, so lower financing rates cannot deliver systemic improvement.

Europe can hold on to nodes, not the entire value chain

🏭
Takeaway 1
A factory does not mean control
The "Made in Europe" label has decoupled from technological leadership. Equipment standards, process certification and supplier networks are still defined by Asia. Moving a plant to Europe does not move industrial capability to Europe.
📊
Takeaway 2
Scale sets the cost floor
PowerCo 20 GWh vs CATL 465 GWh: a gap that won't close for years. Without scale there is no bargaining power, and without that no sustainable cost position.
🎯
Takeaway 3
Policy can only reshuffle the winners
Local content cannot create European champions; it can only decide who wins and how. The biggest beneficiaries of shallow policy are Asian leaders that already have global manufacturing capacity.
🔗
Takeaway 4
The density gap is fundamental
Europe has 2–3 suppliers per component category versus 20 in Asia. That gap determines bargaining power, ramp-up speed and the pace of process iteration. Without density, there is no competitiveness.
⚔️
Takeaway 5
Holding milestones is the pragmatic goal
PowerCo's 20 GWh first phase is an acceptable strategic floor that preserves its technology know-how and policy eligibility. It should no longer chase control of the whole value chain; having a say at key nodes is enough.