↑Back to top
CHANGXUN · Global commercial vehicle watch · 2026.06

DKV's e-truck charging card isn't selling charging,
it's selling the "gateway" to freight energy

On the surface, DKV Card +Charge Truck is a payment card. In substance, during a transition period in which Europe's electric heavy-truck charging hardware is far from in place, it uses a software layer to reprice the existing charging network and seize the gateway for allocating "usable charging capacity". Of 1.2 million general-purpose charging points, only 3,000 allow a heavy truck to drive in, park and recharge. What it sells is the certainty that lets fleets dare to build charging into their schedules, and with it a reshuffling of where profits sit along the entire freight energy value chain.

🚚 3,000+ truck-dedicated charging points ⚡ 80% of sites >300kW 🌍 17+ European countries
0units
Truck-suitable charging points verified against physical parameters, across 17+ European countries
VERIFIED POINTS
0
Dedicated sites offer high power of >300 kW, matching the 45-minute mandatory rest break
>300kW SHARE
0
DKV's overall fallback network (mostly passenger car chargers)
FALLBACK NET
0
Every kilowatt-hour on its own charging network comes from renewable sources
GREEN ENERGY
Product overview

One card, one bill: turning a fragmented charging network into usable supply

ACCESS BAR
4m · 2.7m · 9m
Thresholds for clearance height, lane width and vehicle length
POWER
>80% >300kW
High-power charging matched to rest breaks
BILLING
One card, one bill
Charging + refueling + washing/repair/tires/parking
APP DATA
Real-time availability
Transparent display of price, charging time and kWh
GREEN
100% green power
Renewable energy for every kWh on own network · aligned with Scope 3
SCOPE
17+ countries
Focused on cross-border logistics corridors · launch in 2026
Effective supply

Charger counts are an illusion; only chargers heavy trucks can actually use count

Europe has no shortage of charging points in general. What it lacks are chargers that heavy trucks can drive into, park at and charge from, and that dispatch systems can plan around. The gap from 1.2 million to 3,000 is the real story.

1.2 million vs 3,000: a gap of three orders of magnitude
DKV overall network vs truck-suitable dedicated network (log scale)
▸ DKV provides access to about 1.2 million charge points, but only just over 3,000 are labelled as truck-suitable. The passenger car charging network is already large, but the usable network for heavy trucks is still small. The bottleneck for heavy-truck electrification has always been whether the plug is in the right place, has the right physical conditions and can handle intensive commercial operation. For a dispatch system, a charger a truck can't get into, can't charge fast at or can't park at may as well not exist.
The yardsticks that narrow hundreds of thousands of chargers down to 3,000
Physical access limits for trucks · metres (m)
▸ Clearance height of ≥4 m, lane width of ≥2.7 m, room for a ≥9 m vehicle body, plus enough space to turn and reverse. Stack these physical yardsticks together and hundreds of thousands of chargers open to passenger cars are filtered down to a dedicated network genuinely suited to long-haul semi-trailer operations.
300 kW: the line between whether a 45-minute break is enough to recharge
Power distribution: dedicated network vs general-purpose chargers
▸ More than 80% of the sites verified by DKV offer over 300 kW, while many general-purpose chargers are stuck at 50–150 kW. For heavy-truck drivers bound by regulation to a 45-minute break window, power determines whether they can take on enough charge at a stop.

It turns "charging anxiety" into calculable parameters

Electric heavy truck drivers live with one almost non-negotiable constraint: the rest break required by EU regulation is their only charging window. Dispatchers need a definite answer: is the charger at the next stop free right now, is it above 300kW, and can it top up enough before the break ends.

DKV's app shows users the price, estimated charging time, real-time availability and consumption per kWh. In essence, it turns a vague anxiety once handled through experience and luck into physical parameters that fleets can model, route around and budget for in advance. The "reliability" stressed by product lead Tim Dambor really means pricing an uncertain risk as a guaranteed service. With hardware still widely in short supply, that certainty is worth more than growth in charger numbers.

Hardware gap

MSPs use the software layer to arbitrage the hardware shortage period

DKV doesn't build chargers; it screens them, connects the data and handles billing, because hardware for heavy truck charging will face a huge shortfall for at least several more years. That is the window for software-layer arbitrage.

Hardware is far from ready: the charging and refuelling roadmap from today to 2030
European megawatt charging (MCS) deployment vs 2030 demand · ICCT/industry basis
▸ Milence plans to invest EUR 500 million to build 1,700 stations by 2027; the EU as a whole will have about 330 1 MW MCS points by autumn 2028, while the ICCT estimates 4,000–5,300 MCS points will be needed by 2030. The gap in between is the arbitrage window for MSPs using software to optimize existing hardware.
Even regulation covers only just over half
AFIR coverage of 2030 public charging demand · ICCT
▸ ICCT's assessment: even with AFIR fully implemented, it is expected to cover only 50%–70% of public charging demand in 2030. Coverage is higher on TEN-T core corridors and markedly lower in regional areas. The hardware gap cannot be closed in the short term, which amplifies the value of the software layer.
What 2030 needs to make up is 22–28 GW of capacity
EU-27 electric truck charging capacity demand · GW
▸ ICCT estimates that by 2030 the EU-27 will need 22–28 GW of electric truck charging capacity. Investment on this scale is slow and heavy — grid connections, transformer upgrades and site works pile up — which gives MSPs that "avoid heavy assets and optimise existing ones" a comfortable window.

What is really being reshuffled is where profits sit along the whole value chain

Certified sites are the direct winners. High-power heavy truck charging assets are capital-intensive and slow to pay back, and with the electric heavy truck fleet still at an early stage, a single site can hardly reach decent utilization on walk-in traffic alone. Joining DKV puts a site on the dispatch radar of international haulers, gives it an entry point to B2B fleet traffic, and makes it more bankable in the eyes of banks and energy companies. Conversely, sites without truck maneuvering space, high canopies or high-capacity grid connections will be shut out of high-value freight traffic.

Heavy truck makers gain a buffer, but also hand over customers. For MAN, Mercedes-Benz Trucks, Volvo Trucks, Scania and DAF, third-party networks ease the hardest question in selling electric trucks: "how will it run once I've bought it?" But whoever holds the charging data gets closer to customers' real operations. In the long run, OEMs need to watch out for energy platforms diluting their customer relationships.

Faster divergence

Electrification is a test that filters for operational capability

Dealt the same card, large fleets will benefit sooner and small fleets may be sidelined sooner. What makes the difference is not the truck but the ability to manage power prices, routes and charging windows.

Large vs small fleets: same card, different outcomes
Key operational capabilities compared · conceptual illustration
▸ Illustration: Large fleets have stable routes, complete data and dispatch teams. They can plug the card into their systems, compare prices and timing, and assign diesel and electric trucks to different jobs. Small fleets depend on ad hoc orders and spot freight rates and struggle to absorb detours, queues and peak electricity prices. The card improves "operability"; it will not automatically make every company profitable.
Freight energy providers' four-dimensional race
DKV vs UTA Edenred vs Shell · Competitive dimensions (illustrative)
▸ Illustrative: Competition won't stop at "I have a card too"; it will centre on four dimensions: number of verified sites, coverage of key freight corridors, discounting power, and booking and service-level commitments. DKV wins on its fleet customer base and consolidated billing, UTA Edenred is strong in corporate payments, and Shell in energy supply and site assets.
Costs rewritten

Cost structure shifts from "fuel price per liter" to "energy per km + time + network"

Reducing electric trucks' cost advantage to "electricity is cheaper than diesel" is naive. Competition has shifted from "who has cheap power" to "who can keep vehicles reliably charged without disrupting transport schedules".

Cheap electricity may be eaten up by detours and queuing
Shift in heavy truck energy cost structure · conceptual illustration
▸ Illustrative: Charging a heavy truck at 300 kW looks fast, but what matters is battery capacity, the charging curve, SOC on arrival, queuing time, driver rest rules and delivery windows. A 10 km detour and a 30-minute queue wipe out the on-paper price advantage. DKV's real-time information can reduce this uncertainty but not eliminate it.
Locking in the entry point

Unified billing targets a CFO pain point; green power is a compliance asset that can be written into contracts

What DKV wants to lock in is the messiest cost ledger fleets face during the shift from diesel to electric. The issue is not charging speed but reconciliation complexity.

One card that flattens six categories of operating costs
Service points integrated into a single bill · illustration of integration value
▸ Illustration: A fleet running both diesel and electric trucks faces an expense-reporting nightmare of multiple payment systems, several energy types and cross-border currencies and taxes. DKV brings e-truck charging, conventional refuelling and, at some sites, truck washing, repairs, tyres and parking into a single settlement system, saving the hidden cost of an entire layer of cross-border reconciliation.
From payment intermediary to transport energy operating platform
DKV's value ladder · conceptual illustration
▸ Illustration: For diesel trucks, the value stops at payment, discounts and invoicing. For electric trucks, payment is only the base layer. The higher DKV moves up the stack (real-time availability data, dispatch decision support, route and carbon-ledger optimisation), the closer it gets to the core of a fleet's P&L, and the more pricing power it has.
45 min
Mandatory driver rest = the only charging window
6 categories
Integrating charging, fueling, washing, repairs, tires and parking
Scope 3
Green power certificates linked to shippers' carbon accounting
CBAM
Energy traceability becomes a hard clause in logistics contracts

Green power traceability is DKV's second hold on its customers

DKV promises that 100% of every kWh on its own charging network comes from renewable energy. This figure does nothing for charging speed, but it is becoming more valuable in another way. As the Carbon Border Adjustment Mechanism (CBAM) and the Corporate Sustainability Reporting Directive (CSRD) tighten, Scope 3 carbon accounting for logistics companies is shifting from a bonus to a hard requirement, and energy traceability is being written into more and more tenders and contracts.

By turning "green electricity" into traceable, accountable certificates, DKV effectively helps fleets convert an environmental pledge into a compliance asset that can be written into contracts and offset against carbon accounts. But large shippers will pay increasing attention to certificate quality, temporal and geographic matching, and audit evidence. If the green power is matched only on paper and cannot withstand audits by demanding customers, contract disputes may follow. How firm this grip is depends on how solid the data are.

"What hauliers need to ask is 'which truck takes this load, on which route, where it recharges or refuels, and how to minimise total cost and carbon emissions'. Whoever can answer that question moves to the heart of the fleet's P&L."

Moats and risks

Its moat is the data interface, not those 3,000 chargers

The chargers belong to others. What DKV really controls is the data interface linking CPOs and roaming platforms and syncing prices and availability in real time. That is both its moat and where it is most vulnerable to disruption.

Four risks a card can't solve
Underestimated structural risks · Attention level (illustrative)
▸ Illustration: corridor density (3,000 sites spread across 17 countries, with key trunk-route nodes possibly served by a single usable station), power transition (300 kW is only a stopgap for scaling long-haul and will need upgrading once megawatt charging becomes widespread), grid bottlenecks (multiple trucks charging at high power simultaneously approach megawatt-level loads) and the audit quality of green electricity certificates. None of these four can be bypassed with a single charging card.
The opportunity lies in the data layer, not charging service revenue
From charging card to freight energy database · value extension (illustrative)
▸ Illustration: Combining charging behaviour, site prices, cross-border routes, charging duration and vehicle types into a freight energy database could in turn shape fleet procurement, site selection, energy purchasing and OEM sales. The product scope would extend from charging cards to route planning, charging reservations, dynamic pricing, carbon accounting and toll optimisation.

From competing on assets to competing on access

The significance of DKV Card +Charge Truck is that the freight energy value chain is shifting from asset competition to gateway competition. During the toughest transition years for heavy-truck electrification, the winner will be whoever closes the loop linking physical infrastructure, payment and settlement, dispatch data and customer contracts, not whoever has the most chargers.

The second half of electric heavy trucking will not unfold along industry averages. It will diverge by route, site, fleet size and data capability. The winners will be companies that can close the loop across infrastructure, billing, data and contracts. That divergence is exactly what DKV is betting on now.

THE BOTTOM LINE

In a transition period when the hardware is far from ready, heavy-truck charging will be won by whoever can turn existing resources, scattered and uneven in specifications, into reliable capacity that fleets are willing to build their schedules around. The number of chargers is only the starting point.

This contest is not about hardware but about data, settlement and certainty, which is exactly where a mobility service provider is strongest, and also where it is most exposed to disruption by larger CPOs, OEMs or energy majors. Whether DKV can hold this gateway depends on whether its data interfaces can move faster than the hardware rollout. Once megawatt charging becomes widespread and chargers are no longer scarce, the value of "filtering" will fall. If large CPOs build their own settlement systems, or Milence, the Daimler–Volvo joint venture, bundles charging with truck sales, traffic through a single gateway will be diverted. The window for MSPs may be shorter than expected.

Effective supply Software-layer arbitrage Competing for the entry point