↑Back to top Electric heavy truck cases: long-haul and depot electrification | Data visualization cards

Case studies: electric heavy trucks in long-haul and depot electrification

Key finding: "daytime feasibility" for long-haul heavy trucks is broadly established, but because 87% of trips do not return to the fleet's own depot overnight, matching overnight parking and charging with compliant driver rest in time and place is the biggest bottleneck to scaling up.

Sample: 23 interstate/national long-haul trips Spec: ~600 kWh battery capacity Focus: overnight charging × depot load management
Long-haul charging needs
40%
Only 40% of trips need en-route charging, averaging just about 50 kWh
Overnight parking bottleneck
87%
Most vehicles are not parked at their own depots overnight and rely on third-party sites
Average overnight charging power
~32 kW
With overnight parking, power demand is very low (4–56 kW range)
Depot peak load reduction
85%
With load management, peak demand at a 250-vehicle depot can drop from 27 MW to 4 MW

Daytime: structure of en-route charging demand

Daytime charging is more a scheduling optimisation problem. The median detour is only 4 minutes, and charging needs of 5–180 kWh fit entirely within mandatory rest breaks.

Overnight: breakdown of parking locations

Risk note: Night-time is the system's weak point. Currently 10/23 trips are >30 minutes from the nearest suitable charging point, which can easily trigger driving-time compliance risks.

Trip distance distribution and model coverage

Infrastructure: nominal count vs. truck (Lkw) availability

Note: although many high-power chargers are registered, bays that a 16.5 m trailer can enter and exit are extremely scarce.

Large depot electrification: impact of smart load management (250-vehicle case)

With smart management, the 4.3 MW connection requirement makes it possible to work within existing substation headroom "without major infrastructure upgrades". Reduction rate: 84%

Key facts

Research facts Key data points Strategic/business implications
Daytime long-haul capability is fully covered Average trip of 515 km needs only limited charging The main constraint is no longer "range per charge" but "reliable charging on the road (idle bays and faulty chargers)".
Severe mismatch between overnight charging and parking 87% of trips end the night away from the operator's own depot Logistics operators should prioritise securing public hubs that offer "overnight charging + long-term parking". Asset owners should develop "bay-based low-power chargers".
Compliance is the hard limit on charging 10/23 samples unplugged >30 min at endpoint Charging and refuelling sites must be chosen based on "trip end-point patterns" rather than "trunk road traffic flows". A small error of 5 minutes can lead to speeding or driving-hours violations.
Full depot electrification is highly feasible Peak reduced from 27 MW to 4.3 MW Depot electrification succeeds or fails on deep integration of IT systems and energy management, not on hardware deployment alone.
Chinese heavy trucks' entry point into Europe Europe lacks a complete "depot + operations" package The overseas opportunity lies in offering embedded solutions combining "vehicles + depot energy-management IT + localised compliance support", rather than pure vehicle exports.